Our Projects
Project Name | Industry | Client | Scope of Work |
---|---|---|---|
Diesel Prefractionation Vacuum System | Petro-chemical | Enpro Industries / GD Nash / Farabi Petrochemical | Pipe stress analysis for 5 skids |
Alotau Terminal | Onshore Terminal | Inventive Engineering | Piping design & engineering for the onshore terminal |
1606 WWTP | Lube oil refining | Sequoia Global INC | Pipe stress analysis of 30 lines |
Bassein development 3 well platform | Offshore | Enpro Industries / Sulzer / ONGC | Pipe stress analysis for separator skid – 3 nos. |
C1 | Metal Refinery | Confidential | Piping Study, 3D modeling, stress analysis, Piping Specification – total no. of lines 180 |
BGFCL | Onshore gas field | BGFCL | Front End Engineering for installation of wellhead compressor at Titas Gas Field – Plot plan, equipment layout, piping material specification, MTO’s |
Confidential | Refinery | Confidential | Steam Tracing & Steam Jacketing – manifold planning, mark-up isometric, tracing detail MTO, Jacketed isometric |
Mauli Expnasion Project | Sugar Complex | ThyssenKrupp | Stress analysis & support design for lines connected to steam turbine & associated steam network – header size 700 NB |
Flow Test Lab | Manufacturing | Manas Microsystem | Piping Engineering & Design of flow meter testing lab facility |
Hydorcyclon | Offshore | Enpro Industries / ONGC | Pipe stress analysis for hydrocyclon skid |
TTIP Phase 1 | Onshore oil field | CECO Environmental | Pipe stress analysis of Gas Scrubber Package |
Jet fuel tank expansion | Tank Farm | Artson | Piping Engineering & Design of Jet Fuel Tank Farm including stress analysis |
Water Management at GCs in SK area | Onshore oil field | Frames | Pipe stress analysis for slug lines connected to separator – size 36” |
Multi-Purpose Plant (Stage-1) | Chemical | ChemDist Process Solutions / GCI, Saudi | Piping Study, 3D modeling, stress analysis, Piping Specification – Total no. of lines 250 |
PGC Skid | Onshore | Enpro Indutries / PDO | Pipe stress analysis for PGC skid |
Pressure enhancement project | Biofuel Refinery | Hindustan Biofuels Ltd | Pipe wall thickness calculation, stress analysis, design of supporting for steam line connected to the steam turbine with pressure 117 kg/cm2g & temp 540 degC |
Scrubber | Marine | Confidential | Piping Study, 3D modeling, piping material specification, stress analysis for GRE piping installed on the ship (We are working multiple skids – long term contract) |
PWT Package | Onshore oilfield | CECO Environmental | Pipe stress analysis – 51 lines |
CDU-VDU | Refinery | GD Nash / HPCL | Pipe stress analysis for LRVP package |
SWTP | Oil & Gas | CECO Environmental | Complete Piping Engineering – Piping Study, 3D modeling, stress analysis, Piping Specification – total no. of lines 600. |
Ammonia Storage & handling Facility | Power Plant | CECO Environmental | Complete Piping, Structural & Mechanical Engineering & Design. |
POLO | Chemical | Chemdist Process Solutions / Farabi Saudi | Piping Study, 3D modeling, stress analysis, Piping Specification – Total no. of lines 300 |
CDU-VDU | Refinery | Aker Solutions | Pre-Bid Engineering – MTO for 6000 lines, Plot Plan verification, Piping study for 12” & above lines, Input to Structural team, Preliminary stress analysis |
VSOT | Jetty | Arabian Industries, Saudi | Preparation of 3D model & isometric – 370 lines |
CDU_CDU | Refinery | Tata projects | Steam Tracing study for complete unit, 650 lines |
Coker Complex | Refinery – Fired Heaters 4 nos | ITT, Italy | Piping Study, 3D modelling, stress analysis, Piping Specification – Total No. of lines 350 |
EG Recovery | Chemical | Synergy Process System | Piping Study, 3D modelling, stress analysis, Piping Specification – Total No. of lines 400 |
Colonial Surfactants | Chemical | Economy Process Solutions | Piping Study, 3D modelling, stress analysis, Piping Specification – Total No. of lines 150 |