| Diesel Prefractionation Vacuum System |
Petro-chemical |
Enpro Industries / GD Nash / Farabi Petrochemical |
Pipe stress analysis for 5 skids |
| Alotau Terminal |
Onshore Terminal |
Inventive Engineering |
Piping design & engineering for the onshore terminal |
| 1606 WWTP |
Lube oil refining |
Sequoia Global INC |
Pipe stress analysis of 30 lines |
| Bassein development 3 well platform |
Offshore |
Enpro Industries / Sulzer / ONGC |
Pipe stress analysis for separator skid – 3 nos. |
| C1 |
Metal Refinery |
Confidential |
Piping Study, 3D modeling, stress analysis, Piping Specification – total no. of lines 180 |
| BGFCL |
Onshore gas field |
BGFCL |
Front End Engineering for installation of wellhead compressor at Titas Gas Field – Plot plan, equipment layout, piping material specification, MTO’s |
| Confidential |
Refinery |
Confidential |
Steam Tracing & Steam Jacketing – manifold planning, mark-up isometric, tracing detail MTO, Jacketed isometric |
| Mauli Expnasion Project |
Sugar Complex |
ThyssenKrupp |
Stress analysis & support design for lines connected to steam turbine & associated steam network – header size 700 NB |
| Flow Test Lab |
Manufacturing |
Manas Microsystem |
Piping Engineering & Design of flow meter testing lab facility |
| Hydorcyclon |
Offshore |
Enpro Industries / ONGC |
Pipe stress analysis for hydrocyclon skid |
| TTIP Phase 1 |
Onshore oil field |
CECO Environmental |
Pipe stress analysis of Gas Scrubber Package |
| Jet fuel tank expansion |
Tank Farm |
Artson |
Piping Engineering & Design of Jet Fuel Tank Farm including stress analysis |
| Water Management at GCs in SK area |
Onshore oil field |
Frames |
Pipe stress analysis for slug lines connected to separator – size 36” |
| Multi-Purpose Plant (Stage-1) |
Chemical |
ChemDist Process Solutions / GCI, Saudi |
Piping Study, 3D modeling, stress analysis, Piping Specification – Total no. of lines 250 |
| PGC Skid |
Onshore |
Enpro Indutries / PDO |
Pipe stress analysis for PGC skid |
| Pressure enhancement project |
Biofuel Refinery |
Hindustan Biofuels Ltd |
Pipe wall thickness calculation, stress analysis, design of supporting for steam line connected to the steam turbine with pressure 117 kg/cm2g & temp 540 degC |
| Scrubber |
Marine |
Confidential |
Piping Study, 3D modeling, piping material specification, stress analysis for GRE piping installed on the ship (We are working multiple skids – long term contract) |
| PWT Package |
Onshore oilfield |
CECO Environmental |
Pipe stress analysis – 51 lines |
| CDU-VDU |
Refinery |
GD Nash / HPCL |
Pipe stress analysis for LRVP package |
| SWTP |
Oil & Gas |
CECO Environmental |
Complete Piping Engineering – Piping Study, 3D modeling, stress analysis, Piping Specification – total no. of lines 600. |
| Ammonia Storage & handling Facility |
Power Plant |
CECO Environmental |
Complete Piping, Structural & Mechanical Engineering & Design. |
| POLO |
Chemical |
Chemdist Process Solutions / Farabi Saudi |
Piping Study, 3D modeling, stress analysis, Piping Specification – Total no. of lines 300 |
| CDU-VDU |
Refinery |
Aker Solutions |
Pre-Bid Engineering – MTO for 6000 lines, Plot Plan verification, Piping study for 12” & above lines, Input to Structural team, Preliminary stress analysis |
| VSOT |
Jetty |
Arabian Industries, Saudi |
Preparation of 3D model & isometric – 370 lines |
| CDU_CDU |
Refinery |
Tata projects |
Steam Tracing study for complete unit, 650 lines |
| Coker Complex |
Refinery – Fired Heaters 4 nos |
ITT, Italy |
Piping Study, 3D modelling, stress analysis, Piping Specification – Total No. of lines 350 |
| EG Recovery |
Chemical |
Synergy Process System |
Piping Study, 3D modelling, stress analysis, Piping Specification – Total No. of lines 400 |
| Colonial Surfactants |
Chemical |
Economy Process Solutions |
Piping Study, 3D modelling, stress analysis, Piping Specification – Total No. of lines 150 |